The flow has two or more COMPUTE nodes in a row (WMB)
When IIB/WMB runs a COMPUTE node, the message tree needs to copied multiple times.
Merging code from two (2) compute nodes into one (1) reduces the amount of processing and memory required to run a flow.
There is more material from IBM here: